Prefabricated Modular Temporary Offices and Residential Units for the Prime Ministry Complex Ankara – Türkiye

Project Detail

Country

Türkiye

Date

2013

Sector

Share Post

Information Request Form

In 2013, three-storey temporary office and residential buildings were delivered on a turnkey basis by DORÇE in Ankara, the capital of Türkiye, using a prefabricated steel panel system.

The Temporary Office and Residential Project for the Prime Ministry Complex was planned to meet the public sector’s requirements for rapid installation, functional use, and secure working environments. Implemented in Ankara, the project was completed turnkey by DORÇE Prefabricated Buildings & Construction in 2013 using a prefabricated steel panel building system.

Designed for temporary use, the buildings bring together office and residential units within a single campus, enabling uninterrupted continuity of public operations.

Three-Storey Prefabricated Steel Panel Building System

The structures constructed within the scope of the project were realized using a three-storey prefabricated steel panel system. This system provides the key advantages required in public projects, including short construction duration, controlled factory production, and high structural durability. The prefabricated steel panels were manufactured in a factory environment, transported to site, and assembled in a short time.

Design Suitable for Temporary Office and Residential Use

The temporary office and residential buildings used within the Prime Ministry Complex were functionally planned to meet administrative office requirements as well as temporary accommodation needs. The structures were designed to offer safe and efficient interior solutions suitable for intensive use conditions.

Turnkey Public Building Solution

The project was executed under DORÇE’s turnkey delivery approach, with prefabricated building production, on-site installation, and handover processes managed under a single integrated framework. Thanks to this approach, the project was successfully completed within the planned schedule, in line with the time sensitivity and operational continuity requirements of public institutions.

A Fast and Reliable Reference for Public Sector Projects

The Temporary Office and Residential Project for the Prime Ministry Complex stands as a significant reference reflecting DORÇE’s experience in public buildings, prefabricated steel panel systems, and rapidly deployable temporary structures. Completed in 2013, the project clearly demonstrates DORÇE’s capability to deliver reliable, flexible, and turnkey building solutions for public institutions.