High Efficiency and Rapid Office Infrastructure for the Energy Sector

The Two Storey Modular Administrative Office Building project was implemented in Adıyaman for a strategic institution such as Turkish Petroleum Corporation TPAO. The project stands as a qualified example demonstrating the effectiveness of modular construction technologies in multi storey office buildings and their ability to respond rapidly to corporate operational requirements.

Dorce completed the project under the Design and Build delivery model, managing all phases from architectural and engineering design to infrastructure and superstructure construction through a single integrated approach with a high level of engineering discipline.

Technology Leadership and Expertise in LGSF Panelized Modular Construction

In this project, Dorce utilized cold formed light gauge steel frame structural systems, in which the company has developed strong expertise for multi storey modular buildings.

Through this panelized construction method, wall, floor, and roof panels together with load bearing steel frames were manufactured in a controlled factory environment and delivered to site, allowing the main structural integrity to be established within a short period of time. This approach minimized on site construction duration while maximizing quality consistency and speed.

Efficiency and Cost Effectiveness

Thanks to the panelized modular construction methodology, the project with a total construction area of 3,600 square meters was completed efficiently between March 2024 and October 2024. The key operational and financial advantages achieved include:

Rapid Construction Process:
The system met the requirement for fast deployment office buildings, allowing installation and infrastructure works to proceed simultaneously with structural assembly.

Cost and Resource Efficiency:
Controlled factory production minimized material waste and ensured cost effectiveness.

High Construction Quality:
Factory based manufacturing delivered long term durability and consistent, measurable building performance.

Functional Design Aligned with Corporate Requirements

The two storey administrative office building was designed with a clear focus on corporate use and operational efficiency. The functional layout includes administrative offices, meeting rooms, and support units, offering an ideal, economical, and sustainable solution tailored specifically to the requirements of the TPAO office building project.

A Strong Reference in Energy and Industrial Buildings

This project stands as a strong reference demonstrating Dorce’s engineering capability in energy sector office buildings, LGSF office structures, and panelized modular construction systems. It clearly proves the speed, quality, and flexibility offered by modular systems for administrative and commercial buildings.