Rönesans Ankara Courthouse Turnkey Multi Storey Prefabricated Modular Container Worker Accommodation Camps

Photo Gallery

Project Detail

Country

Türkiye

Date

2025

Sector

Share Post

Information Request Form

Rönesans Ankara Courthouse Construction Camp – Ankara, Türkiye Turnkey Multi Storey Modular Steel Building Solutions by Dorce Rapid and Secure Mobilization for One of Türkiye’s Largest Public Buildings

In collaboration with Rönesans Construction, Dorce successfully delivered a comprehensive modular construction camp designed to meet the accommodation, working, and social facility needs of thousands of personnel involved in the Ankara Courthouse project. Recognized as one of Türkiye’s largest public building developments, this project clearly demonstrates Dorce’s advanced engineering expertise, production capacity, and rapid mobilization capability in modular steel building technologies.

Fully Multi Storey Prefabricated Modular Steel Building Technology All the Requirements of a Modern Construction Camp Delivered Through a Single Integrated System

The mobilization camp for the Ankara Courthouse project consists entirely of multi storey modular steel buildings engineered up to four floors. The camp layout was designed with a modern infrastructure concept that integrates all functional units required to support daily life, operational coordination, and workforce efficiency on site.

The modular buildings within the camp include:

Living Areas:
High comfort worker dormitories, as well as dedicated accommodation modules for engineers and managerial staff.

Administration and Offices:
Site offices, executive offices, HSE (Health, Safety, Environment) units, clinic facilities, and administrative departments.

Social Facilities:
Modular gymnasium, recreation areas, and laundry units.

Hygiene and Support Structures:
WC and shower modules, hygiene units with septic tank systems, security checkpoints, and technical maintenance and repair buildings.

All structures were designed for long term use, offering both comfort and structural durability while fully addressing the logistical and operational requirements of a large scale construction site.

Modular Solutions Optimized for Speed and Efficiency Maximum Performance Through Dorce’s Production and Logistics Strategy

The successful and rapid completion of the project was driven by Dorce’s advanced manufacturing and logistics approach.

Factory Completed Module Production:
All living and office buildings were fully manufactured and equipped at Dorce’s high capacity production facility in Ankara.

Logistics Efficiency:
While the building modules were transported to site as fully finished plug and play units, corridor blocks were delivered in flatpack form. This method significantly improved transportation efficiency and provided cost advantages.

Minimal On Site Assembly Time:
Thanks to the advantages of offsite production, the camp was installed and made operational within a very short timeframe, directly supporting the project schedule of a major contractor such as Rönesans.

Energy Efficiency and Four Season Comfort Superior Performance of Rockwool Insulation

High density Rockwool insulation used in all modules delivered significant benefits in terms of both energy efficiency and occupant comfort. This insulation system:

Enhanced thermal and acoustic insulation performance
Ensured stable indoor conditions in all seasons
Reduced operational costs and enabled sustainable long term camp use

Dorce’s Expertise in Multi Storey Modular Steel Structures for Public Project Mobilization

The mobilization camp developed for the Ankara Courthouse construction project serves as a strong reference showcasing Dorce’s leadership in modular steel building technologies, engineering strength, and serial production capability.

With its multi storey modular building solutions, Dorce is one of the most experienced manufacturers in Türkiye and the region, consistently delivering rapid, secure, and sustainable mobilization for large scale public and infrastructure projects.