DORCE, In pipeline projects;
- Within the scope of pipeline projects, it builds permanent accommodation facilities and management offices with prefabricated modular structures for pump stations and maintenance centers in different locations.
- It completes the modular prefabricated building systems called mobile or “fly camp”, which are on the pipeline construction route and that can adapt to the constant displacement during the construction period.
- It completes turnkey temporary camp structures, accommodation facilities and management offices for temporary terminals that may be needed at pipeline transfer and discharge points.
- It also completes all storage and large-scale hangar projects on turnkey basis that may be required within the scope of the project.
- It is the first company that comes to mind in mega oil and gas pipeline projects that has more than 5 thousand kilometers in length and need to be completed simultaneously in different phases across different countries. ( BTC – (Baku Tbilisi Ceyhan Pipeline Project) – SCPX (South Caucasus Pipeline) Pipeline Project – TANAP (Trans Anatolian Pipeline ) – OCP Pipeline Mobilization Camp)